    108 Street Industrial – Corridor Rehabilitation

    108 Street, Westlock, AB

    Project Description: Phase Two will continue the project from the Bulk Water Station to CN Rail. This project will continue the work from Phase One with upgrading the roadway, underground infrastructure, and curb/sidewalks along 108 Street. This project requires the removal of the existing road surface and curb/sidewalks, installing a new sanitary water main, installing a new roadway structure, and installing new curbs and sidewalks.

    Grants, Funding Source: Funding approved through 2020-2024 Capital Plan. 

    Partners: MPE Engineering Ltd. and Knelsen Sand & Gravel

    Anticipated Start Date for Phase Two: June 2023

    Anticipated Completion Date for Phase Two: October 2023


    Phase One of this project was completed in November 2021. This project was comprised of upgrading the roadway, underground infrastructure, and curb/sidewalks along 108 Street. This project required the removal of the existing road surface and curb/sidewalks, installing a new sanitary water main, installing a new roadway structure, and installing new curbs and sidewalks. 

    Phase One Start Date: April 6, 2021

    Phase One Completion Date:  November 2021

    Department Contact:  Director of Operations